Financial overview

Where do we stand on value, cost and return across the portfolio?

14 of 90 closed projects excluded — not calculable
65 of 180 projects excluded — no budget set
104 of 180 projects excluded — not calculable
Hub split: Sheffield 35% · Düsseldorf 32% · Detroit 33% of booked hours
8 of 60 commitments excluded — no evidence recorded
These projects are excluded from every value measure on this page

Actual value and cost by month — both series in £ on one shared axis, no dual axis

CRM + EPMS

Value by iHub

CRM
104 of 180 projects excluded — no value recorded

Attention strip — financial exceptions needing a decision

CRM + EPMS
174 exceptions, eight shown · sorted by magnitude, ranked within exception type · every row drills through · stage payments carry status only, never an amount

Analyse in Excel

This connects Excel live to the model rather than downloading a snapshot. A PivotTable built this way refreshes against the same figures as this page — the numbers stay current instead of ageing in a saved workbook — and the measures and folders in the field list are the ones used here: Value, Cost, Effort, Schedule and Counts, in business language, with the currency and decimal places already set. A measure with nothing to report comes through blank, not zero.

As at 2026-08-12 · EPMS refreshed 2026-08-12 05:40 UTC · CRM refreshed 2026-08-12 04:05 UTC · GBP, period-average rates
Cost basis: project engineering time only. Excludes senior management time, business development time, travel. Not yet agreed.
  1. Tab order:
  2. 1. Page title and question
  3. 2. Slicer strip (Period, Region, iHub, Project type, Status, Currency)
  4. 3. Reset bookmark
  5. 4. Bands 1–6, left to right then top to bottom
  6. 5. Value and cost trend
  7. 6. Value by iHub
  8. 7. Attention strip (row by row, then drill link)
  9. 8. Analyse in Excel
  10. 9. As-at, currency basis and cost basis notes